HOW TO USE
1. Use 4 pcs of bush and 2 pcs of pin to mount the breaker on excavator.
2. Grease in and outside of bush when attaching it to the bracket.
3. Keep the breaker horizontal and attach arm of excavator and bucket link together with 2 pcs of pin.
4. Insert pin and stop it with hex bolt and spring washer.
Tighten Torque 8N・m
5. Connect hydraulic hoses to the PTO port on excavator.
Be sure to turn off engine this time.
Connect the hoses correctly. Upper side hose of the breaker is IN, and lower side hose is OUT.
6. Grease moil point and insert to the breaker.
Insert retainer pin and fix it with washer and spring pin.
7. After operation, turn off the engine when you take out moil point.
Be sure to wear glove since moil point would get very hot after operation.
8. To remove the breaker, place the breaker horizontally on the ground, depressurize the breaker circuit, and then stop the engine.
While the breaker is being used, temperature of each section rises as oil temperature rises.
Use gloves to avoid unnecessary damage due to high temperature.