Always check and confirm the using power source is complied with the specifications of this pile driver.
Preparation
1. Check and confirm if the Driving Tool is fit for the pile you intend to drive.
Change the tool if necessary.
STD: ID 150mm Option: For Guard Rail Post/ H Steel.
Always apply 5g grease on tool shank and grease up 4-5 times by grease gun through the hole of front end and set the tool with retainer pin and spring pin when you use it.
2. Connect the pile driver to hydraulic power source and remote control valve with extension hoses which is always to be machine side.
At this time, remote valve must be in OFF position.
3. Use wire to lift the pile driver (See Fig. )
4. Place pile vertically on the point which you intended to drive in.
Set the pile driver on the top of pile. Be cautious not to let the pile driver falls.
Operation
5. Start the power source.
6. Loose the lifting wire slowly.
7. Turn the lever of remote valve to ON position, and the pile driver start working.
Make sure that pile stays vertically without inclination
8. While pile has been driven into the desired depth, Stop the pile driver by turning the lever of remote valve to OFF position.
After Operation
9. After operation stop the power source.
10. Stop the power source and detach the connection hoses and control valve.
11. Clean each component and part of pile driver.